top of page

Last-Mile Delivery
Frito-Lay EV Fleet Depot Site
 
Installation

Atom Power installed twenty-eight 80A level 2 charging ports for an entire distribution depot electrification project in Charlotte, NC, which resulted in Atom being awarded several additional depots for this company.

Download case study

bottom of page