top of page

Mecklenburg Paint Company
Installation

Atom Power installed four dual-port 48A level 2 charging ports for a van depot electrification project in Charlotte, NC, utilizing existing infrastructure, avoiding extra costs and time to energize the vehicles in their parking lot.

Download case study

bottom of page